ABB Power Generation Ltd.
Consultancy on developing a PDM Strategy for ABB Power Generation Business Unit.

ABB Power Plant Laboratories
Education and Training in Object Modelling. Mentoring through initial stages of developing an Object model for the Business Lifecycle.

ABB Power Systems AB
Evaluation of 3D Cad systems for HVDC plant design.

BAE Systems Marine
Ongoing consulting role in a project to enhance the Engineering process and applications to integrate with MRP II for First in Class product introduction.

CargoLifter Development GmbH
Principal consultant for CargoLifter's ongoing PDM implementation. Phase 1 involved integration of Requirements, Design and Planning functions around a central product database. Phase 2 extending this capability is ongoing.

GEC Marine
Design of enhancements to CAD and PDM systems. Development of a whole lifecycle PDM strategy for Shipbuilding.

Harland & Wolff
Education and Training in Object Modelling. Analysis of Business processes and development of a Strategy for integrating Planning and Engineering.

Hughes Space and Communications
Training, Modelling and Technical Consulting in support of a project to eliminate Production Drawings for Satellite Assembly.

Lawrence Livermore National Laboratories
Analysis of Lifecycle Data Management requirements for the National Ignition Facility. Training in Object Data Modelling.

Marconi Marine (YSL) Ltd.
Design of a PDM to MRP II interface. Development of a full lifecycle PDM strategy and architecture.

Mivan Formwork
CAD Software and Vendor analysis and Selection

Nokia Telecommunications
Audit of Data Management and Document Management initiatives and recommendations for integration. Development of outline strategy for PDM development.

Short Brothers Plc
Technical and Project management of the Implementation of a CORBA based PDM environment integrating Design, Scheduling, Planning and MRP II.

Solar Turbines
Audit of current Design and Manufacturing processes. Preparation of outline proposal for PDM implementation.

UDLP
Analysis of requirements for PDM implementation and MRP II integration. Development of an outline solution for Engineering Bill of Material to Manufacturing Bill of Material transition automation.